The industry's largest single-unit coolant distribution unit. 8 MW in one footprint, built for the next generation of AI hyperscale.
Capacity: 8 MW. Every unit is DCX-engineered in Europe, certified for 45°C warm-water operation, and delivered with Middle East-grade corrosion protection. Backed by our Dubai and Doha-based engineering teams for design, installation and 24/7 service.
| Parameter | Value |
|---|---|
| Cooling capacity | 8,000 kW |
| Form factor | Modular multi-skid |
| Primary water inlet | Up to 45°C |
| Return water | 55°C+ for heat reuse |
| Redundancy | N+1 or 2N, per-pod zones |
| Pump technology | Industrial EC VFD parallel-pumps |
| Controls | SCADA + redundant PLC |
| Integration | OPC-UA, Modbus, BACnet, REST |
| Footprint | Approx 10 × 4 m (multi-skid) |
| Lead time to GCC | 18–22 weeks |
| Designed for | 100+ kW/rack AI pods |
GB200 NVL72, B200 clusters
NEOM Oxagon, G42 Abu Dhabi
Hyperscaler Middle East regions
Saudi Aramco, KACST, Mohammed VI
50 MW+ buildings
Sustainable AI campus design
Next-gen 700 W+ GPUs in 120–150 kW racks. A single 8MW FDU supports a pod of approximately 50 AI racks with full direct-to-chip cooling.
At the time of writing (2026), the DCX FDU 8MW AT4 holds the title of the largest single-footprint CDU on the market. Competitors peak at 5–6 MW.
With the matched 2 MW dry coolers (4×) and adiabatic assist, we maintain supply water at 35–38°C even at peak summer.
Yes — parallel multiple FDU 8MW units. DCX supports multi-FDU orchestration via a shared SCADA.
10–14 days including commissioning, assuming civil and piping are ready.