The UAE's AI investment pace is unmatched: G42 alone has committed to building hyperscale AI factories with NVIDIA DGX SuperPOD and GB200 clusters. These 700 W+ GPUs cannot be cooled with air. The country's +48-50°C summer ambients make air-cooled chillers economically unworkable above 40 kW/rack. Liquid cooling — specifically DCX's warm-water-compatible 45°C systems — is the proven, deployed answer.
Air cooling becomes exponentially more expensive as ambient temperatures climb. Liquid cooling is the only economic path to sub-1.2 PUE in UAE's climate.
UAE operators are racing to deploy GPU clusters. Liquid cooling unlocks 100 kW+ racks needed for NVIDIA H100/H200/GB200.
Sales engineering and service support on the ground. Hours, not weeks, to any critical site in UAE.
Warm-water cooling eliminates chillers. Optional heat-reuse loops feed desalination and district heating — ideal for UAE.
Our solutions support the country's flagship digital infrastructure initiatives:
Every DCX product we distribute across the GCC is stocked, sized and installed by our local team.

600 kW → 2.6 MW rack-based coolant distribution units. Perfect for pods, clusters and Tier IV.
View ECDU range
Hyperscale facility distribution units for the largest AI campuses in UAE.
View FDU
Submerge standard 19" servers for 100% heat capture — perfect for UAE's climate.
View H1000
Captures 80% of heat at the CPU/GPU source. The cheapest upgrade path for UAE operators.
View Direct-to-Chip
Engineered for +55°C ambient. Essential for UAE's summer peaks.
View dry coolers
Bulk GCC delivery of engineered immersion fluids — long-life, eco-friendly, odorless.
View fluidsYes — we maintain regional warehouses in Jebel Ali Free Zone for critical spares, pumps, filters and dielectric fluid. Most spare parts can ship to any UAE site within 4 hours.
Absolutely. Our engineering team covers the entire UAE — Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah. Response SLA 4 hrs for mission-critical contracts.
Yes — Aamtron Group is UAE-licensed with full trade and MEP contracting credentials. We can be added as approved vendor on any project.
We work across all UAE jurisdictions — mainland, free zone, offshore. Import, installation and handover paperwork is handled end-to-end.
Yes. We design 45-55°C heat reuse loops that can feed district cooling plants, desalination pre-heat, or absorption chiller arrays — directly supporting UAE Net Zero 2050.
Entry ECDUs: 8-10 weeks. Enterprise ECDUs: 12-16 weeks. FDU 5/8 MW: 16-22 weeks. All quoted to site in the UAE including customs, transport and installation.